• Ua
    • Оголошуємо про старт літніх супер-знижок до -15%.
      More about the promotion
    • Video consultation in Zoom
      Dear Customers! We care about your safety, so we offer you a new format of consultation - video consultation in Zoom. You can stay in home and have a consultation manager.
      More about the promotion
    • #Будуємо щодня!
      More about the promotion
    Sales
    Choose
    an apartment
    Sign up
    to visit

    Construction dynamics as of March 26, 2020

    House 1
    Works with:
    • plastering of surfaces (24 surfaces in operation);
    • arrangement of the ventilation facade of the plinth;
    • finishing of the idea of ​​overland use (10 surfaces);
    • installation of an individual heat point;
    • roof arrangement (left with gravel);
    • arrangement of external engineering measures: waterfall and sewerage (VC).

    Completed works with:
    • installation of translucent structures of the 1st surface;

    House 2
    Works with:
    • installation of elevators;
    • roof arrangement;
    • facade insulation;

     Completed works with:
    • arrangement of cement-sand screed;
    • heating up to 18 surfaces;
    • arrangement of water supply system up to 18 surfaces;
    • power supply up to 12 surfaces;

    House 3
    Works with:
    • installation of translucent structures of the 1st surface;
    • arrangement of the ventilation facade of the plinth;
    • a savings and heat point;
    • finishing of the head part up to 16 surfaces;
    • roof arrangement (left with gravel);
    • arrangement of external engineering measures: waterfall and sewerage (VC).

    Completed works with:
    • Installation of the front door.
    • plastering of all surfaces;


    House 4
    Carry out robotics and personnel management (pantry, stroller);
    Finished work on the gadget.


     House 5
    Fieldwork arrangement completed. Points for stuffing muscle of concrete for repeated fracture of a finger by static loading.


     House 6
    Work is done on the gadget.
    Fieldwork arrangement completed.
    Hide article