    Dynamics of construction as of June 26, 2020

    Hello! As you can see, construction work does not stop for a minute. So, for the house №1, 100% readiness for such works: - The monolithic framework of the house is erected; - Arranged walls and partitions; - Waterproofed plinth; - The roof is arranged; - There is a water supply system on all floors; - Arranged heating on all floors; - Mounted power supply systems on all floors; - Cement-sand screed on all floors; - Insulated and painted facade; - Equipped with translucent structures of the 1st floor; - The ventilated facade of a socle is arranged; - Installation of doors is carried out; - Completed interior plastering on all floors; - All floors are glazed; - Completed plastering works on all floors and stairwells; - An individual heating point has been installed. 95% or more of work performed with: - Installation of lightning protection; - Sewer installation; - Soil backfill to the design mark. 85-90% are ready to work with: - Finishing of common areas 2-24 floors; - Installation of radiators; - Installation of fire alarm and smoke removal; - Installation of elevators. 50% of the work on finishing the stairwell №1 and №2 is ready. I report the readiness of 30% for the following works: - Decoration of the design lobby on the 1st floor; - Installation of a panel board; - Commissioning works. House №2 The following works are 100% completed: - The monolithic framework is erected; - Arranged walls and partitions on all floors; - Waterproofed plinth; - Water supply systems are arranged on all floors; - Arranged heating systems; - Power supply systems have been installed on all floors; - Cement-sand screeds are arranged; - Completed interior plastering on all floors; - Glazing is made on all floors. 95% of the facade insulation works have been completed. At the stage of 80-90% readiness the following works: - Filling of soil to a design mark; - Arrangement of the roof on the 20th and 23rd floors; - Installation of elevators (5 elevators); - Facade insulation. 60% of the facade painting works have been completed. House №3 To date, work has been completed on: - Erection of a monolithic framework; - Arrangement of walls and partitions; - Glazing on all floors; - Arrangement of a roof on the 20th on the 26th beliefs; - Installation of cement-sand screed; - Insulation and painting of the facade; - Plastering of all floors; - Installation of doors on all floors; - Installations of translucent structures on the 1st floor; - Installation of an individual heating point; - Arrangement of the ventilated facade of a socle; - Arrangement of engineering networks on all floors, namely: • Lightning protection; • Sewerage; • Water supply; • Heating; • Power supply. 90-95% are ready to work with: - Soil backfill to the design mark; - Installation of radiators; - Installation of elevators; - Installation of sewerage and smoke removal system; - Decoration of common areas on the 2nd-26th floor. 80% of the work on the pumping station has been completed. 60% of the work on finishing the stairwell №1 and №2 is ready. At 30% readiness for the installation of the panel 25% of the work on finishing our design lobby on the 1st floor has been completed. House №4 Completed 100% of works with: - Installation of the pit; - Test 326 piles; - Arrangement of the foundation of the tower crane; - Arrangement of the foundation; - Formation of a monolithic framework of 1-6 floors. 75% ready monolithic frame of the 7th floor. We are building very quickly, as you can see, +3 floors per month. But the installation of the walls of the 2nd floor has been completed by 40%. House №5 Completed work on: - Installation of the pit; - Testing of pile bushes; - Test 327 piles; - Installation of the foundation of the tower crane. 80% of the concrete foundation preparation has been completed. House 6 100% ready from: - Installation of the pit; - Testing of pile bushes; - Test 327 piles; - Monolithic frame of the basement and the 1st and 2nd floors. 50% of the work on the installation of the grille is ready Sincerely, your Light Park
    Hide article